Personal |
||
| Name | : | Zainul Ulum |
| Date of Birth | : | March 11, 1974 |
| Status | : | Married |
| : | zainul_ulum@cbn.net.id | |
Objectives |
||
| - | Geodetic Engineer | |
| - | Developer of Excel Visual Basic Application for Land Surveying | |
| - | Geographical Information System Analyst | |
| - | Project Management and Project Control | |
Education |
||
| - | Geodetic Engineering, Gadjah Mada University | |
| Grad. Year 1998 | ||
Highlight |
||
| - | Proficient in use of surveying packages including Land Development Desktop, Autodesk Survey and Autodesk Civil
Design, Civil 3D |
|
| - | Skilled with visual basic application for Land Development
Desktop, AutoCAD, Civil 3D and Microsoft Excel |
|
| - | Thorough understanding of Digital Mapping, Digital Terrain
Model and concept of Geographical Information System including coordinates transformation, projection coordinate system and data conversion |
|
| - | Proficient in use of various Geographical Information System
software packages including AutoCAD Map, ArcView and ArcInfo |
|
Experience |
||
| PT Encona Inti Industri | September 01 to Present | |
| Project | : | Project Management Support Services |
| Duration | : | July 2008 -October 2010, October 2010 to Present |
| Position | : | Contract Coordinator, Executive Sponsor |
| Client | : | PT. Chevron Pacific Indonesia |
| Job Description | : | Provides and Assures Man Power Supply to meet chevron’s
requirement for Project Management Support of North Duri (Heavy Oil) Development Project. |
| : | Control Earned Value vs Budgeted Value issued by client | |
| : | Assuring and Applying project management, Health and Safety Management, Business Administration Principles, Contract Management, Contract Law and Personel Management to comply on Contract Documents, National and Local Law including man power regulation, taxation regulation and immigration regulation. | |
| Project | : | Feasibility Study For Export Jetty On Sungai Mesuji |
| Duration | : | Feb 2008 to April 2008 |
| Position | : | Project Manager / Geodetic Engineer |
| Client | : | PT Central Proteina Prima Tbk |
| Job Description | : | Facilitated regular meeting between encona and client |
| : | Supervised GPS geodetic survey, tidal observation and
calculation |
|
| : | Managed and coordinated hydraulic engineer expert, harbour
expert, drafters and surveyor for designing Export Jetty |
|
| Project | : | Soil Investigation And Detail Engineering Of Duri Canal
Improvement Project |
| Duration | : | Mar 07 to Nov 07 |
| Position | : | Project Manager / Geodetic Engineer |
| Client | : | PT. Chevron Pacific Indonesia |
| Job Description | : | Managed and coordinated hydraulic engineer, hydrology
engineer, geotechnical engineer and surveyor for designing slope stability reinforcement and canal improvement |
| : | Supervised and analyzed cross section survey using Civil
Design prior to be processed on HEC RAS (Hydraulic Cal. Software). |
|
| : | Developed visual basic application for excel to automate
cross section drawings and generate input for HEC RAS. |
|
| Project | : | Goetechnical Investigation on Batang Field |
| Duration | : | Nov 06 to Jan 07 |
| Position | : | Project Manager |
| Client | : | PT. Multistructure & Tripatra Flour (Contractor for PT. Chevron Pacific Indonesia) |
| Job Description | : | Managed geotechnical engineer and geotechnical surveyor
for generating report of factual soil properties and recommendation for soil improvement |
| Project | : | Study and Engineering Of Bekasap OU Infield Drainage System
include Aerial Survey by Satellite |
| Duration | : | April 05 to September 06 |
| Position | : | Geodetic Engineer |
| Client | : | PT Caltex Pacific Indonesia |
| Job Description | : | Planned, directed and conducted hydraulic survey &
hydrology survey including terrestrial surveys and GPS geodetic survey. |
| : | Supervised QuickBird image data processing including aerial triangulation, DEM collection and ortho photo processing. | |
| : | Develop data exchange between Microsoft Excel and Land
Development Desktop with visual basic application to speed up and to improve cross section drawings, plan profile drawings and topographic maps |
|
| : | Applied knowledge of Digital Terrain model (DTM) and
Geographical Information System (GIS) with ArcGIS 9 for hydrology and hydraulic analysis. |
|
| : | Responded to written and telephone requests for
topographical analysis to PT. Caltex Pacific Engineers |
|
| Project | : | Study and Engineering Of Bekasap OU Infield Drainage System |
| Duration | : | April 04 to October 04 |
| Position | : | Geodetic Engineer |
| Client | : | PT Caltex Pacific Indonesia |
| Job Description | : | Planned, directed and conducted hydraulic survey &
hydrology survey including terrestrial surveys and aerial photogrammetry |
| : | Supervised aerial photogrammetry including aerial
triangulation, dem collection and ortho photo processing. |
|
| : | Develop data exchange between Microsoft Excel and Land
Development Desktop with visual basic application to speed up and to improve cross section drawings, plan profile drawings and topographic maps |
|
| Applied knowledge of Digital Terrain model (DTM) and
Geographical Information System (GIS) for hydrology and hydraulic analysis. |
||
| Responded to written and telephone requests for
topographical analysis to PT. Caltex Pacific Engineers |
||
| Project | : | Detail Engineering Design for Auxiliary Airport for TNI AU
Wonosari, Gunung Kidul, DIY |
| Duration | : | May 04 to Sept 04 |
| Position | : | Geodetic Engineer |
| Client | : | TNI Angkatan Udara (Air Force Army of Republic Indonesia) |
| Job Description | : | Researched previous survey data such as maps, deeds and
physical markers. |
| : | Determined precise location and measurements of points,
elevations, lines, areas and contours necessary for mapmaking |
|
| : | Analyzed and processed surveyed data with Land
Development Desktop including estimated cut – fill volume, prepared finished design (grading) and prepared alignment for staking out |
|
| : | On screen digitizing topographic map from BAKOSURTANAL
using AutoCAD Overlay and then processed in Arcview 3D Analyst for viewing 3D image of existing obstacles which can influence to the airport design. Coordinated work with CAD Drafters, engineering, architectural and other staff on project. |
|
| : | Analyzed surveyed data, source maps and photographs,
computer and automated mapping products |
|
| Project | : | Detail Engineering Design Service for Duri Drainage and Canal
Improvement |
| Duration | : | Nov 01 to August 03 |
| Position | : | Geodetic Engineer |
| Client | : | PT. Caltex Pacific Indonesia |
| Job Description | : | Responsible for Planned, directed and conducted surveys of
land areas of significant and specific size |
| : | Utilized complex computations to compile data used in the
preparation of geodetic maps and charts using visual basic application for Land Development Desktop and Microsoft Excel |
|
| : | Built visual basic application to speed up and to improve
cross section drawings, plan profile drawings and topographic maps. |
|
| : | Applied knowledge of digital terrain model and geographical
information system in flood analysis using land development desktop and ArcView |
|
| : | Assisted subordinates and supervisors in identifying and
resolving problems |
|
| : | Collaborated on data preparation for hydraulic and
hydrological analysis |
|
| : | Responded to written and telephone requests for
topographical analysis to PT Caltex Pacific Engineers |
|
| PT. Bukit Semarang Baru, Semarang | ||
| Duration | : | Aug 01 to Sept 01 |
| Position | : | Chief Surveyor |
| Job Description | : | Responsible for Planned, directed and conducted surveys on
land areas covered 900 Ha |
| : | Built visual basic application for down-loading data from total
station sokkia SET 5F to Land Development Desktop and for up-loading coordinates design drawing to total station sokkia SET 5F. |
|
| : | Conducted surveys for staking out new alignment of
roadways, canals buildings and other design drawings. |
|
| : | Prepared database for Geographical Information System with
AutoCAD Map by combining existing design CAD drawing with external database (access database). |
|
| Universitas Sumatera Utara, Medan | ||
| Project | : | Geographical Information System Project for PDAM Tirtanadi
Medan, Sumatera Utara |
| Duration | : | April 01 to Aug 01 |
| Position | : | ArcView Programmer / GIS Developer |
| Client | : | PDAM Tirtanadi Medan, Sumatera Utara |
| Job Description | : | Supervised and coordinated the activities of on screen
digitizing concerned with the preparation of spatial data , attribute data and map components.. |
| : | Developed design concept of map product and geographical
information system to handle various spatial queries and presentation maps by customizing arcview program with avenue programming. |
|
| : | Defined production specifications such as projection, map
index, scale, size and colors |
|
| : | Provided guidelines for source material to be used such as
maps, automated mapping products, photographs, survey data and place names which would be linked to spatial database |
|
| : | Supervised and coordinated the compilation and editing of
product components and monitored reproduction |
|
| Geodetic Engineering, Gadjah Mada University, Jogjakarta | ||
| Project | : | Instructor of Digital Mapping for Administration Cadastral
Mapping Project |
| Duration | : | Nov 00 to Dec 00 |
| Position | : | Instructor |
| Client | : | Badan Pertanahan Nasional |
| Job Description | : | Developed and conducted programs to train in the database
programming with Microsoft Access, digital mapping with AutoCAD Map, and automated mapping with total station. |
| : | Developed simple Land Information System for
Administration Cadastral Mapping Project with PC Arc/Info. |
|
| : | Scheduled classes, based on availability of classrooms,
equipment and instructors. |
|
| : | Evaluated training packages, including outline, text and
handouts written by other instructors |
|
| PT. Firama Citra Utama, Jogjakarta | ||
| Project | : | Administration and Cadastral Mapping Project |
| Duration | : | Jul 99 to Mar 00 |
| Position | : | Geodetic Engineer |
| Client | : | Badan Pertanahan Nasional |
| Job Description | : | Employed surveying instruments such as Electronic Distance
Measurement and theodolites to improve network of travers over earth’s surface. |
| : | Planned, directed and conducted surveys of land areas of
significant and specific size |
|
| : | Used special high-accuracy techniques, including distance
reduction and angle reduction resulted from map projection |
|
| : | Analyzed survey data, source maps and photographs,
computer and automated mapping products. |
|
| : | Expedited communication between upper level management
and general personnel |
|
| : | Directed the preparation of reports and legal descriptions of
land for publishing Land Certificate |
|
| : | Prepared and approved budget for unit and organization
within assigned area of responsibility |
|
| : | Satisfied legal requirements according to standard surveying
practices |
|
| Project | : | Administration and Cadastral Mapping Project |
| Duration | : | Jul 98 to Mar 99 |
| Position | : | Arc/Info and Visual Basic Programmer |
| Client | : | Badan Pertanahan Nasional |
| Job Description | : | Customized PC Arc/Info for digital mapping including map
cropping, map merging, automatic labelling and map plotting with SML programming |
| : | Built visual basic application on microsoft excel to perform
coordinates transformation and map projection |
|
| PT. Atlasbumi Semesta, Jakarta | ||
| Project | The Detailed of Flood Control, Urban Drainage and Water
Resources Development in Semarang |
|
| Duration | : | Jul 96 to Mar 97 |
| Position | : | Surveyor |
| Client | : | JICA, PASCO |
| Job Description | : | Marked points of measurement with elevation, station
number and other identifying mark |
| : | Geodetic Global Position System (GPS) survey | |
| : | Topographic mapping and cross section survey with total
station GTS 211D |